Brief slideshow about the story of Barnhart showing our capabilities
40-year old company that has become one of the premiere crane rigging & heavy transport companies in the country mainly supporting the energy sector.
One the reasons we have been able to grow successfully is that sat down about a dozen years ago put on paper what we are about? Our mission statement – be the best with core values that we take very serioulsy
Getting new aerial done.
Strategic alliances across the country allow us to provide equipment resources at competitive rates.
Hydraulic cranes to 500T Forklifts to 120k Heavy Lift cranes to 1,760T Goldhofer transporters to 12,000T Towable Self propel units Electronic steer units Dolly transporters to 350T 1,250T MS River terminal 2,800T Modular Lift Tower Jacking & sliding systems Innovative rigging systems
We feel we have the best tool belt in the industry. At our core we started as a crane company. We know cranes very well. But also heavy transport having the largest Goldhofer fleet in the nation. Very diverse in the other tools we offer, from lift tower systems (fully designed & built by BCR) to jacking systems to various custom built systems for equipment installation.
Removed and replace a reactor after the customer called to see if we had an idea that would avoid removing equipment, pipe and structure above the unit. We supplied only a man, equipment and a plan. The crane was supplied by others
Called in by the customer to look at removing and replacing the MSR in halves. After looking at the job we suggested that it could be done without cutting the units in half. Following a laser survey to prove it, we were awarded the job. This shortened the outage, improved quality (shop fab of the entire unit) and lowered the total cost.
Called in by the customer to look at removing and replacing the MSR in halves. After looking at the job we suggested that it could be done without cutting the units in half. Following a laser survey to prove it, we were awarded the job. This shortened the outage, improved quality (shop fab of the entire unit) and lowered the total cost.
Standard MLT arrangement over 200’ tall. Unique features are the MTT (Modular Tailing Tower), pin puller and highly versatile adjustable lifting links. MLT used two 850T strand jacks
Because a heavy barge crane was not available we were asked to develop a method to replace two lock gates without a heavy crane. The 500T hoist was mounted on bents / rollers to lift and travel on the 8’ deep girders. The barge was the tailing system. The entire system had to be load tested after erection which we did by lifting the CC2000 that was used to erect the girders.
Standard heavy lift but tailing was completed with the Golhofer tailing device to avoid the need for another large crane. Not to mention that there was very little room for it.
In 2009/2010 we did over 200 modules in support of modular refinery construction. These were loaded out in Tampico Mexico
Two ESP (electrostatic precipitators) were to be installed in a live unit of a refinery to comply with EPA clean air laws. Rather than run the risks associated with stick building the units over a control room and in a live unit, ExxonMobil decided to fully erect them in a construction yard. Both units were built on our 8’ deep girders so we could lift then 28’ with the MLT then place the 88 lines of Goldhofer under them with shoring to carry them into the plant and set the ESP units on final steel. Design weight was actually 2,800 Tons
Received various pieces at a fab shop in Houston, hauled to the dock, used a barge crane to transfer to barge and ship inland
Received this on barge at the site. The freight forwarder loaded it to barge and delivered to the job in Joliet, IL. Fortunately, the saddles had jacking pockets (shown) so we could us climbing jacks to raise them for self loading. Hauled and set with the CC2600
Standard heavy lift but tailing was completed with the Golhofer tailing device to avoid the need for another large crane. Not to mention that there was very little room for it.
Typical turbine and generator hauling project but we had several structures to cross. Some we jumped and another one we used doublewide Goldhofer. Note that we brought the second trailer along side, made the connection then slid the load to the center of the combined trailer.
Simple alternative to using a big crane to set two engines that arrived to this compressor station late. The construction manager had never heard of gantry and rigging an engine in this way.
Customer: John Deere Wind Energy Developer: John Deere Wind Energy Scope: Variable with project but up to- offload, transport on site, wash, erect, grout, tension, manage civil, haul and/or set transformers, mechanically and electrically complete. BCR has installed 90% + of JD’s turbines. We have managed the issues of constructing small wind farms for JD- logistics, construction phase schedules, multi-mobilizations.
Customer: Invenergy Developer: Invenergy Scope: receive at pad, erect, mechanically and electrically complete Extreme weather conditions (Buffalo NY in the winter) overcome on schedule. Multiple landowner issues overcome for effective movement of equipment on site. Logistics for 24 crane moves managed over city and county roads.
Customer: Horizon Wind Energy Developer: Horizon Wind Energy Scope: receive at pad (or haul from laydown yard), offload, wash, erect, mechanically and electrically complete, grout, tension Subcontractors: Christenson Electric We were awarded Phase II of the farm shortly after Mortensen finished Phase 1. Each phase was 120 turbines. Mortensen used 6 erection cranes, countless offloading and base setting cranes, 18 pickers, 35 forklifts, and 250 men to complete Phase 1 in ~11 months. We brought 1 LR 1350, 1 500t hydro, 3) pickers, 6) forklifts, and peaked with 83 men to erect the second phase in 6 months. We did so by managing site conditions (landowners, highways, gas lines, powerlines, and erection sequence) to minimize crane breakdowns and maximize schedule.
Customer: TVIG (Tennessee Valley Infrastructure Group) Developer: E-On Scope: Receive, wash, erect, mechanically complete, align gearbox Subcontractors: Evolution Energy Group (aligning gearboxes) Texas heat, 172 turbines in ~120 days with numerous wind days. Zero recordables
So far, two of these systems have been assembled and are available through PEG.
Customer: Vestas Developer: WKN Scope: Receive at pad, erect, mechanically and electrically complete Subcontractors: JMS Electrical The largest wind turbines in the US. M18000 with MAXER. 400’ main boom.
Customer: Horizon Wind Developer: Horizon Wind Scope: Receive at pad, erect, wash, mechanically complete Added second crane at the customer’s request to overcome delivery delays and complete on schedule. CC2800 narrow track LR1600
Customer: Clipper Developer: Clipper BCR assisted Clipper in developing installation procedures for their turbine. We engineered the 6-point lift rigging which permits the machine base, gearbox, and nacelle fiberglass to be set in one lift. 100,000+ man hours with Zero recordables in harsh winter conditions
National Presence (Licensed in 45 states) 4 Offices Strong Customer Base Long Term Customer Relations Construction Diversity Unlimited Bonding Capacity
Capabilities Presentation
A History of Success
Corporate Philosophy
World Class Home Facilities – Memphis, TN
Expanding Across the U.S.
Strategic Cooperative Alliance
Serving Major Markets
Primary Services Heavy Transportation Alternative Lifting Solutions Install or Remove & Replace Outage Planning and Management Heavy Lifting Crane Service Heavy Cargo Logistics Rigging Innovation and Fabrication Industrial Storage Critical Path Optimization Modularization Support
Full Fleet of Equipment Hydraulic Cranes to 500T Heavy Lift Cranes to 1,760T Goldhofer Transporters to 12,000T Dolly Transporters to 350T Steel Mats, Barge Ramps, Temp Bridges 2,800T Modular Lift Tower Jacking & Sliding Systems Self Tailing Systems Innovative Rigging Systems Full Tool / Rigging Inventory
Core Values In Action Barnhart is dedicated to being proactive in creating better methods and tools to meet the needs of our customers. INNOVATION
Component Replacement Mixing Vessel Replacement 38’ Cantilever Beam with Tri-Block Reactor replacement without removal of overhead obstructions
Component Replacement One piece replacement of two 300T MSR units MLT, strand jacks, tip stick and slide system Avoided cutting units in half and field welding Job of the Year
Component Replacement Diablo Canyon Nuclear Power Station Reactor Head Replacement Job of the Year
Heavy Lifting Lift and tail of 1,000T reactor MLT, strand jacks, tip MTT and slide system Avoided cost and congestion of an extremely large crane
Heavy Lifting Replacement of two 360T lock gates without a barge crane 150’ girder runs, MLT, 500T Hoist and heavy truck rollers Avoided floating derrick crane and allowed lock to be dry for inspection and repair Job of the Year
Transport Jack and Slide of 500-ton Transformer
Heavy Lifting Lift & Replacement of 700,000lb Alston Stator using 1000-ton crane
Modularization Support Barge loadout of process modules up to 800T Goldhofer PSTe, ramps and securement systems Included marine engineering and ballast plans
Modularization Support Assembly, lift, transportation and placement of two 2,000T ESP units 88 lines Goldhofer, shoring, MLT and strand jacks Major construction in a live unit without an outage Job of the Year
Heavy Cargo Logistics Process equipment loading, inland transport and discharge Goldhofer, Floating derrick crane and barge service Efficient use of varied means of operations to deliver on-time
Heavy Cargo Logistics Transfer, transport and install refinery scrubber Barge, Climbing Jacks, PSTe Goldhofer, Demag CC2600 Integrated logistics and erection
Heavy Lifting Lift & Replacement of 700,000lb Alston Stator using 1000-ton crane
Heavy Transport Offload, haul & set a generator and a turbine. Single and double PSTe Goldhofer trailer, Slide System, Bridge Jumpers Transfer to double wide PST to make bridge crossings
Logistics – from barge to site
Heavy Transport 150 mile haul of a 900,000 lb stator from ship to site 48 axle suspension girder transporter Extensive planning, engineering and upgrades to make a world class move
Barge roll off of 1400-ton Module
Heavy Transport Shipment of 450-ton Conoco Phillips reactor. With use of bolsters for rail clearance.
Reducing Critical Path Relocation of two ESP units in a live unit. MLT, PSTe Goldhofer, Specialy Jacks and Slide System Safe relocation in 12 day s per unit Job of the Year
Alternative Lifting Solutions 900T Reactor transport and erection MLT, Goldhofer PSTe, Modular Tailing Tower Economical alternative to a Heavy Lift Crane
Alternative Lifting Solutions Compressor Station engine placement PSTe Goldhofer, 800-Ton Gantry Allowed building and piping to continue even with equipment delay
Our Commitment to Wind Energy Leaders in the Wind Turbine Erection field for > 6 years In excess of over 1800 turbines erected totaling over 3500 MW ~ 10% of the newly installed turbines since 2002 Trained Wind Service Employees strategically dispatched through our Branch Network Experience with manufacturers and Turbines such as: Vestas V100,V90, V80, V82, V47 Suzlon S88, S64 GE 1.5XLE & SLE RE Power 2.1 Clipper C96 Micon NM72 Gamesa G80, G83, G87, G90
Barnhart Renewables Project Management / Planning & Constructability Review Engineered Innovation Cargo Logistics and Route Survey Erection Services – over 1800 WTG’s installed to date Maintenance Services Component replacement Scheduled services Facility operation BOP Services
Our Commitment to your Project… Preconstruction – Maximizing road and crane pad design Component route survey & constructability review Detailed site walks & “white board” discussions Efficient erection schemes or fast track projects
Our Commitment to your Project… Construction – Managing resources to maximize productivity Can provide transport and installation to reduce overall project cost Extensive experience managing union labor with national agreements Extensive crane knowledge reduces crane move impact to overall schedule Intense QA program turns over turbines faster for commissioning
Evanston, WY – turnkey transport & erection of 144MW Wind Farm
Located & managed railhead… Designed blade hauling saddles to be used in conjunction with single blade erection Evanston Logistics
Buffalo Mountain – turnkey transport & erection of 27MW Wind Farm the project that industry experts said couldn’t be done…
beginnings of road construction… Barnhart worked extensively with road engineers to minimize civil cost
Barnhart Blade Trailer greatly reduced turn radius (< 90’)
Barnhart Pull Power > 20% grades
Barnhart has installed over 1200 blades via “single blade” Less crane pad & cleared area required…
John Deere Projects JD 1-8 Bluegrass Ridge Conception Cow Branch Loess Hills Harvest Wind Three Mile Canyon Agri-Winds Corn Plus Cisco Wind Ewington Wind Echo Canyon Suzlon S64 Suzlon S88 Vestas V82 REpower 2.0 small back-to-back projects called for good planning and strict adherence to schedule
Tapping Maple Ridge 350MW of Vestas V82’s 75 full crane moves while erecting 195 turbines…
Safe & efficient “self tail” of tower sections… removing need for tail crane
turbine erection - even in the harshest conditions
Invenergy’s High Sheldon Wind Farm 75 GE1.5 - 80m towers Sheldon, NY
127 turbines erected without a single punch-list item Puget Sound Energy’s Wild Horse Wind Farm 275MW - Vestas V80’s
Twin Groves II Wind Farm 120 Vestas V82 - 80m tower Bloomington, IL Owner stated he had never seen a better turnaround between a phase I (done by others) & a phase II
Panther Creek Wind Farm 172 GE1.5 - 80m towers Garden City, TX most aggressive project owner had attempted to date
our engineered Super Lift systems overcome terrain issues and reduces the civil requirements on your site for heavy lift operations. Meridian Way Concordia, KS 200MW of Vestas V-90’s
Snyder Wind Farm 21 Vestas V90 on 5-section - 105m towers Snyder, TX tallest turbines in the country
Rattlesnake Road 49 Suzlon S88’s on 80m towers Arlington, OR
Boston, MA Barnhart Project Locations
Canadian Project Locations 10/8/2008
Our Commitment to your Project… Post construction maintenance services Generator, Gearbox or Blade replacements Bore scope gear box inspections Routine schedule maintenance work Component upgrades Storage maintenance performed to manufacturer specs Crane Operation Management Services – You own the crane; we mobilize, maintain and take care of it for you…
Barnhart Wind Maintenance - when a problem occurs, ….
Endeavor Wind Farm 40 Clipper C96 - 80m Harris, IA Barnhart worked with turbine supplier on rigging design & lifting procedures
Barnhart Crane-less Single Blade Exchange Challenges – Develop a solution to safely remove & install wind turbine blade without the use of a main lift crane… Solution – Single hoist line rigged through engineered lifting system to blade root to lower & raise blade
Hoist cable with load cell. Always knowing condition of the lift.
Only crane needed – 75ton RT tail crane for load & unloading
Emergency Component Change 24-hr service
Our Commitment to Quality Complete Quality Assurance program with an Observe, Verify, and Document philosophy. Site Specific QA Plans ensure ZERO line item punch lists are attained by having QA Technicians present and active at the point of installation to prevent errors- not identify them after the mistake has been made. Provide the customer a complete set of documents from receiving through completion in preferred format (hard copy or electronic). Quality is “built in” – not “inspected in”
Signal Energy Constructors, LLC Full Service EPC/BOP Contractor Over 20 Projects Completed in the United States and in Canada Over 400 Turbines Installed Wide Industry Experience Turbine Types Foundation Types Substations Rigorous Safety and Quality Standards Financial Stability 10/8/2008 BOP Company
Subsidiary of EMJ Corporation Founded in 1968 59th Largest General Contractor in the United States (ENR 400) Licensed in 45 states Unlimited Bonding Capacity Proven Safety and Quality Records Offices in Chattanooga, Boston, Sacramento, Dallas Signal Wind headquartered in Chattanooga, TN Corporate Structure 10/8/2008
Full service EPC /BOP Contractor Broad Experience Base Foundation Types Spread Footing Standard P&H Rock Anchor Turbine Technologies GE Siemens Vestas Clipper Suzlon Signal Wind Energy, LLC 10/8/2008
Full service EPC /BOP Contractor Broad Experience Base Civil Infrastructure Wide Range of Topographic Conditions Wide Range of Geotechnical Conditions Ridge Top Construction Experience Substations 230kV:35kV 138kV:35kV 115kV:35kV Collection Systems Underground Overhead Transmission Lines 115kV 69kV Signal Wind Energy, LLC 10/8/2008
Concentrated Photovoltaic
56kW CPV installed in Adelanto, California
Our Commitment to You We will: Provide the highest quality service giving you the Best Built turbines in the business Be Responsive to Outage Situations Remain Competitive through Innovation and Efficiency Perform your project Safely Remain Flexible - Listen & Learn Strive to be “Easy to Do Business With”
Thank you! Minds Over Matter