Slide 1

Godau IT Room Realistic

Quach Dang Khoa
3/2008

Slide 2

Agenda

Tasks List

1

IT Room Construction

2

Cable Restructure

3

Old PCs Conversion

6

Slide 3

Task List

1

IT Room Construction
Fireproof wall/ceilling
Raising floor
Two Aircons & Controller
Electrical system
Others (built up the window, true ceiling, etc)

2

Cable Restructure
Fiber optic
LAN/Tele Cable
Relocate PBX
Discommission old calbe/nerwork system
Tidy up
Improve Aircon system in IT room (HCM)

3

Cakey system
New Cable
Relocate carkey PC
Miscellaneous (repeater, convertor, etc)

Slide 4

IT Room Construction

Fireproof wall & true ceilling

Build raising floor

Install two air-conditioners

IT ROOM

Install cardkey reader for IT door

Electrical system &
Air-conditioner controller

Smoke detetors

Painting & sanding

Slide 5

IT Room Construction (Scope)

IT room - Size 4000mm x 3000mm

Rasing floor - FFH (high): 300mm
- Concentrated Load: 4.5KN/point
- Distributed Load: 12KN/m2 - 36KN/m2
- HPL Panel, Aluminum/steel head

Remove the existing windows in the IT room (office A)
Install two aircons Panasonic 2 HP
aircon controller inside IT room

Reuse & install new 3 smoke detectors in the new IT room

Slide 6

IT Room Construction (Scope)

Supply & install gypsumboard partition wall
- 2 layers of 16mmTHK gypsumboard wall.
- Metal stud ( 50 x 36 ) & Boral Gupsum board ( 13kg/m2 )
Supply & install fire proof gysumboard ceilling
- Model: BPB Thaigypsum
- Thickness: 12mm
Fire Door
- W x L = 910 x 2000mm
- Painting & sanding
- Door closer - New Star
Painting & sanding

Slide 7

IT Room Construction (Concern)

Can be extended the size of room bigger ?

Can we install more smoke detector inside the room?

Can we install FM200 for this room, any S&C or safety concern ?

Slide 8

Cable Restructure

Slide 9

Cable Restructure


Optical Fiber - Armored 62.5/125
4 cores
- Using 2 cores for
link and 2 cores for
backup - Implement RING topology - Link that connected
between B & C is
designed for spare




LAN & Tele cabling

Cat-6 UTP AMP
Install 2 LAN ports
and 1 tele port at
each point.
Implement STAR
topology for Tele
cable - Relocate tele, frame
relay backbone to
Office A



Site
connection

Slide 10

Cable Restructure

Slide 11

Cable Restructure

Slide 12

Cable Restructure

Slide 13

Cable Restructure (Scope)

CABLE RESTRUCTURE
Connect LAN/Telephone cable to each user's desk in Control Room
Connect LAN/Telephone cable to each user's desk in office B & A
Using forklift truck to mount the cable along the beam of production area
Excavate the furrow in the way the cable is crossed the road/under ground
Do the loop test for whole cable (cardkey system, LAN, Telephone, FO)
Relocate 15 telephone lines, frame relay & Internet ADSL to MDF (offi.A)
Relocate PBX
Relocate Cardkey System
Relocate the Router (from office B) & (Switch from office A) to server room,
Switch to new network and do the testing
Discommission & tidy up old network cable


Slide 14

Cable Restructure (Concern)

Any demand for installing a telephone port in front desk?

Does the Pantry need a telephone port?

Does Plant Manager need one more LAN/tele port in the room?

Does Security station need a LAN/tele port ?

Do we have any speaker in IT room for alert in case of fire?

Slide 15







Office A






Office B


Office C


Cardkey system Relocation

Cabling for current cardkey system

FO Cabling for new

Cabling for new cardkey system

Slide 16

Project Schedule

3/2008

4/2008

4/2008

5/2008

6/2008

Slide 17

Project Schedule

Slide 18

Old PCs Conversion (Milestone)

3/2008

5/2008

5/2008

6/2008

7/2008

Slide 19

Old PCs Conversion (List)

Godau IT room Relocation II