Discover_the_Discovery

+2

No comments posted yet

Comments

Slide 2

SHUTTLE PROCESSING (Before Flight Activities Rarely Seen By The General Public)‏ DISCOVER --- DISCOVERY

Slide 3

External Tank Arrives by Barge from MS

Slide 4

Vertical Assembly Building External Tank

Slide 5

Removing External Tank From Carrier

Slide 7

External Tank Enters VAB

Slide 8

External Tank in VAB

Slide 9

Preparing to Lift the Tank to Vertical

Slide 10

Lifting Tank

Slide 11

Solid Rockets Are Attached

Slide 12

Engines Are Attached To Solids

Slide 13

Engines Are Attached To The Shuttle In The Shuttle Processing Facility

Slide 17

Shuttle In Sling Ready For Lift In VAB

Slide 18

Shuttle Has Been Moved To VAB And And Will Be Attached To External Tank

Slide 20

Shuttle is Attached

Slide 24

Payload Preparation Room (PPR)‏

Slide 25

Cargo Package For ISS

Slide 26

New Module For ISS

Slide 27

Payload Ready To Be Moved to The Launch Pad

Slide 29

Payload Carrier Leaves PPR

Slide 31

Payload Being Moved To Launch Pad

Slide 33

Lifting Payload Into Position For Insertion Into Discovery When It Arrives At The Pad

Slide 36

Shuttle Discovery Leaves VAB

Slide 38

Shuttle & Crawler Launch Pad TRIP: Length--- 3 ½ mi Time--- 6-8 hours

Slide 40

Crawler Control

Slide 42

DISCOVERY ARRIVES AT PAD

Slide 46

READY FOR LAUNCH

Slide 47

We Have Lift Off

URL: