|
|
This may be again a good time to reinforce the point that all of an organization’s strategies must work together.
Students may be asked to evaluate alternative layouts for an emergency room. Perhaps a visit to view a local emergency room might be helpful.
Okay, here's the equipment layout that a Cell Design Kaizen Team. A U-shaped flow cycles from the Raw Material (RM) through the 8 Work-stations to the Finished Goods (FG). The cell works in a counter-clockwise U-shaped flow The next step is to populate the cell with raw materials, components, drums of coolant & cleaners. All in labeled containers. Now, we need access aisles all around the cell for material replenishment, equipment servicing and quicker changeovers. Main aisles on both ends of the cell allow for material flow and personnel flow between cells. We've right-sized the material containers, so we eventually run out of raw materials and the green diamond represents a Kanban Post that will play a vital role in material replenishment Now, the blue bin runs empty--no more parts--what happens next???? This rack on the backside of the cell contains a second set of components in a second set of labeled and right-sized containers. So the operator simply walks the side-aisle to the rack, picks up a new container of parts and puts it in the work-station But how do we get it replenished again?? Put the empty labeled bin on the Kanban Post and the Material Clerk who circulates throughout the shop will take the empty back and refill it before the backup container can be emptied....
Students can be asked to provide examples of instances in which these rules were implemented.
1 © 2005 Superfactory™. All Rights Reserved. Lean Office – Layout & Cells Superfactory Excellence Program™ www.superfactory.com
2 © 2005 Superfactory™. All Rights Reserved. Objectives of the Layout Strategy Develop an economical layout which will meet the requirements of: product design and volume (product strategy) process equipment and capacity (process strategy) quality of work life (human resource strategy) building and site constraints (location strategy)
3 © 2005 Superfactory™. All Rights Reserved. Six Layout Strategies Fixed-position layout large bulky projects such as ships and buildings Process-oriented layout deals with low-volume, high-variety production (“job shop”, intermittent production) Office layout positions workers, their equipment, and spaces/offices to provide for movement of information
4 © 2005 Superfactory™. All Rights Reserved. Six Layout Strategies - continued Retail/service layout allocates shelf space and responds to customer behavior Warehouse layout addresses trade-offs between space and material handling Product-oriented layout seeks the best personnel and machine use in repetitive or continuous production
5 © 2005 Superfactory™. All Rights Reserved. Emergency Room Layout
6 © 2005 Superfactory™. All Rights Reserved. Cellular Workplaces FG RM Includes Every Step Source Inspection Point of Use Storage Flexible Output Reduced Lot Size Simplified Handling Visual Goals & Metrics
7 © 2005 Superfactory™. All Rights Reserved. Retail Layouts - Some Rules of Thumb Locate high-draw items around the periphery of the store Use prominent locations such as the first or last aisle for high-impulse and high margin items Remove crossover aisles that allow customers the opportunity to move between aisles Distribute what are known in the trade as “power items” (items that may dominate a shopping trip) to both sides of an aisle, and disperse them to increase the viewing of other items Use end aisle locations because they have a very high exposure rate
8 © 2005 Superfactory™. All Rights Reserved. Precedence Diagram Example
by ahmad1957 | Modified: 4 years ago
Language: English (Detected) | Topic: Business & Finance
| 412 Views | 3 Embeds |
Summary: Office Layout
| URL: |
No comments posted yet
Comments