City IT SShow

+2

No comments posted yet

Comments

Slide 1

Slide 2

Randwick TAFE Audit 2009 Audit was performed on Wednesday the 3rd of June. 4 Computers were unable to be audited. A total of 11 computers were audited

Slide 3

All Hardware was identical Acer Veriton 5700GX Intel Pentium 4 HT 40 Gb Hard Drives 2 Gb RAM 3.5” Floppy Disk Drives DVD R / RW Broadcom NetXtreme Gigabit Ethernet Realtek Audio Hardware:

Slide 4

All Software was identical Software: Windows XP Service Pack 3, as operating System Microsoft Office 2007, including Word, Excel, Access, PowerPoint, Publisher. Adobe products Adobe Reader, Macromedia Dreamweaver and Fireworks. All software is licensed and 100% legal.

Slide 5

Four Faulty Computers 3 Require Rebuilding 1 requires replacement RAB138-12 RAB138-09 RAB138-11 RAB138-13

Slide 6

Age of Hardware Pentium 4 with HT technology was released May 2003. Six – year old CPU technology. 2.50 Ghz – 3.0 Ghz not a real indicator.

Slide 7

SIX YEAR OLD TECHNOLOGY

Slide 8

Sydney Institute of TAFE “Our Vision – To Be Progressive and Influential – To Change Lives” “Our Purpose – To Build Social and Economic Capability by Providing the Education and Training Students and Customers Need to Achieve their Ambitions”

Slide 9

Sydney Institute of TAFE “Our Values: Progressive – We are future – focused, always advancing and enterprising Passionate – We care about our students and customers, and meeting their needs is our top priority. Influential – We are the catalysts of change and at the forefront of industry trends. Professional – We are well-connected to industry and act in a professional way Capable – We know how it’s done and can show students how to do it.”

Slide 10

future – focused catalysts of change well-connected to industry to be Progressive

Slide 11

SIX YEAR OLD TECHNOLOGY Because...

Slide 12

Basic Plan Primary Teaching computer replaces the computer unable to be repaired. City IT will supply a Custom Build Computer with the latest technology for Primary Teaching computer Replace 3 other faulty computers within two months. Have a complete room of hi-tech computers within 3 Months.

Slide 13

You will THEN match your core values and meet your goals

Tags: it5

URL:
More by this User
Most Viewed
Previous Page Next Page
THE SMART GROUP1
THE SMART G...
 
 
 
Previous Page Next Page