LTA-KPE Infographic

+1

No comments posted yet

Comments

Slide 1

Infographic / Parallel View / 2003v 2003 version of PowerPoint recreation of http://www.lta.gov.sg/KPE/index.htm

Slide 2

Construction Site Proposed Underground Structure Diverted Road Hoarding Construction Methods / Project Sites Parallel View (Isometric)

Slide 3

Construction Site Proposed Underground Structure Diverted Road Hoarding Construction Methods / Project Sites Perspective View (Isometric)

Slide 4

2007 Version of PowerPoint

Slide 5

01. Construction of Guide Wall -1200mm -800 to 1000mm Guide Wall A Guide Wall is constructed to set out the position of the diaphragm wall. Parallel View (Isometric)

Slide 6

01. Construction of Guide Wall -1200mm -800 to 1000mm Guide Wall A Guide Wall is constructed to set out the position of the diaphragm wall. Perspective View (Isometric)

Summary: LTA-KPE Infographic

Tags: 3d infographic

URL:
More by this User
Most Viewed